LINE LOADABILITY IN AC LINES

In order to prevent over voltages at light loads, it is necessary to have devices for absorbing reactive power (like shunt reactors) not only at either end of a long line but even at intermediate points. Generators connected at the ends of the line have limited reactive power absorption capability as defined by their capability curves. If transmission redundancy exists (i.e., parallel transmission paths exist), then a very lightly loaded long line may be tripped to avoid overvoltage. However this may be detrimental to system security if some additional line trippings take place due to faults. If shunt reactors are permanently connected, they result in large sags in the voltage under heavy loading conditions. Moreover, reactive power demanded by long transmission lines under these situations may be excessive and may lead to system-wide low voltage conditions.
Compensation of a line involves changing the effective line parameters by connecting (lumped) capacitors in series and shunt. These compensating elements effectively reduce the line reactance and increase the shunt susceptance, thereby decreasing the surge impedance. Thus the effective SIL of a capacitor compensated line is higher than an uncompensated line. This increases the loadability of a long line.

Since total conductor cross-sectional area for EHV lines is mainly decided by electric field considerations (corona), these lines have large thermal capabilities, much in excess of the SIL. For long EHV lines, one cannot deviate much from SIL due to voltage constraints. Therefore, the thermal limit of a long EHV line is not the key limiting factor. However, thermal limit is the main limiting factor for short lines (< 100 km) wherein voltage constraints are not violated even for large deviations from SIL.

Comments

Popular posts from this blog

AUTO TRANSFORMER TAP CHANGING

Figure shows diagrammatically auto-transformer tap changing. Here, a mid-tapped auto-transformer or reactor is used. One of the lines is connected to its mid-tapping. One end, say a of this transformer is connected to a series of switches across the odd tappings and the other end b is connected to switches across even tappings. A short-circuiting switch S is connected across the auto-transformer and remains in the closed position under normal operation. In the normal operation, there is no inductive voltage drop across the auto-transformer. Referring to Figure, it is clear that with switch 5 closed, minimum secondary turns are in the circuit and hence the output voltage will be the lowest. On the other hand, the output voltage will be maximum when switch 1 is closed. Suppose now it is desired to alter the tapping point from position 5 to position 4 in order to raise the output voltage. For this purpose, short-circuiting switch S is opened, switch 4 is closed, then switch 5 is op...

PLUG REVERSING OF CAPACITOR START MOTORS

The capacitor start motors suffer from the disadvantage that they are not easily reversible due to the centrifugal switch connected in the auxiliary winding. The motor cannot be instantaneously reversed by simple control as the auxiliary winding remains disconnected till the motor comes near to zero speed. However, by proper design of the control circuit the motor can be made instantly reversible. This is accomplished by using an electromagnetic relay along with a special two contact centrifugal switch as shown in Figure. The circuit shown in Figure is for a small hoist using a capacitor start motor. The upper and lower limits of travel are controlled by two limit switches viz. LSU and LSD. When UP-push button is pressed, contactor U gets energized. Its contacts U 1  and U 2  energies the main winding. Closing of its contact U 3  causes relay R to get energized through the centrifugal switch contacts A—B. After the energization of relay R auxiliary winding gets ene...

BENEFITS OF UTILIZING FACTS DEVICES

The advantages of using FACTS devices in electrical transmission systems are described below. 1. MORE UTILIZATION OF EXISTING TRANSMISSION SYSTEM In all the countries, the power demand is increasing day by day to transfer the electrical power and controlling the load flow of the transmission system is very necessary this can be achieved by more load centers which can change frequently. Addition of new transmission line is very costly to take the increased load on the system; in that case FACTS devices are much economical to meet the increased load on the same transmission lines. 2. MORE INCREASED TRANSIENT AND DYNAMIC STABILITY OF THE SYSTEM The Long transmission lines are inter-connected with grids to absorb the changing the loading of the transmission line and it is also seen that there should be no line fault creates in the line / transmission system. By doing this the power flow is reduced and transmission line can be trip. By the use of FACTS devices high power t...

PRIMARY SECONDARY AND TERTIARY FREQUENCY CONTROL IN POWER SYSTEMS

Primary, Secondary and Tertiary Frequency Control in Power Systems Author: Engr. Aneel Kumar Keywords: frequency control, primary frequency control, automatic generation control (AGC), tertiary control, load-frequency control, grid stability. Frequency control keeps the power grid stable by balancing generation and load. When generation and demand drift apart, system frequency moves away from its nominal value (50 or 60 Hz). Grids rely on three hierarchical control layers — Primary , Secondary (AGC), and Tertiary — to arrest frequency deviation, restore the set-point and optimize generation dispatch. Related: Power System Stability — causes & mitigation Overview of primary, secondary and tertiary frequency control in power systems. ⚡ Primary Frequency Control (Droop Control) Primary control is a fast, local response implemented by generator governors (dro...

AC Transmission Line and Reactive Power Compensation: A Detailed Overview

  Introduction The efficient operation of modern power systems depends significantly on the management of AC transmission lines and reactive power. Reactive power compensation is a vital technique for maintaining voltage stability, improving power transfer capability, and reducing system losses. This article explores the principles of AC transmission lines, the need for reactive power compensation, and its benefits in power systems. Keywords: Reactive Power Compensation Benefits, STATCOM vs SVC Efficiency, Power Transmission Stability Solutions, Voltage Stability in Long-Distance Grids, Dynamic Reactive Power Compensation.      Fundamentals of AC Transmission Lines AC transmission lines are the backbone of modern power systems, connecting generation stations to distribution networks. They have distributed electrical parameters such as resistance ( R R R ), inductance ( L L ), capacitance ( C C ), and conductance ( G G ) along their length. These parameters influence ...

Breaker Schemes in Substations

Breaker Schemes in Substations — Types, Design, Advantages, Disadvantages, and Comparison Author: Engr. Aneel Kumar Figure 1: Infographic overview of breaker schemes commonly used in substations. Introduction The breaker scheme or busbar arrangement in a substation defines how incoming feeders, outgoing feeders, and power transformers are connected to the bus. The choice of scheme has a direct impact on system reliability, maintainability, safety, and cost . A simple bus scheme is economical but vulnerable to outages, while advanced schemes such as breaker-and-a-half or double-bus/double-breaker provide very high reliability but at much higher cost and design complexity. Engineers select breaker schemes considering fault tolerance, maintenance needs, space requirements, expansion possibilities, protection coordination, and capital investment . Below, we explain eac...

Advantages of Per Unit System in Power System Analysis | Electrical Engineering

  Advantages of Per Unit System in Power System Analysis In electrical power engineering, the per unit (p.u.) system is one of the most widely used techniques for analyzing and modeling power systems. It is a method of expressing electrical quantities — such as voltage, current, power, and impedance — as fractions of chosen base values rather than their actual numerical magnitudes. This normalization technique provides a universal language for system calculations, minimizing errors, simplifying transformer modeling, and enabling consistency across multiple voltage levels. Because of these benefits, the per unit system is essential in fault analysis, load flow studies, transformer testing, and short-circuit calculations . ⚡ What is the Per Unit System? The per unit system is defined as: Q u a n t i t y ( p u ) = A c t u a l   V a l u e B a s e   V a l u e Quantity_{(pu)} = \dfrac{Actual \ Value}{Base \ Value} Q u an t i t y ( p u ) ​ = B a se   ...